Operation and optimized dispatch of power station in the upstream of the Heihe River Basin
Operation and optimized dispatch of power station in the upstream of the Heihe River Basin

Operation and cascade operation scheme of reservoirs (4 power stations under Gansu Power Investment Management) in the upper reaches of Heihe River (operation and optimal operation scheme of the first, second, third daowan and Baoping hydropower stations in Longshou)

Copyright & License

Word format storage

Data Citations
Cite as:

Jiang, X. (2015). < b>Operation and optimized dispatch of power station in the upstream of the Heihe River Basin</b>2015. doi: 10.3972/heihe.280.2014.db. (Download the reference: RIS | Bibtex )

Using this data, the data citation is required to be referenced and the related literatures are suggested to be cited.


Terms of Use

To respect the intellectual property rights, protect the rights of data authors, expand services of the data center, and evaluate the application potential of data, data users should clearly indicate the source of the data and the author of the data in the research results generated by using the data (including published papers, articles, data products, and unpublished research reports, data products and other results). For re-posting (second or multiple releases) data, the author must also indicate the source of the original data.

Support Program

None

Related Resources
Comments

Sign In to add comments

Keywords
Geographic coverage
Spatial coverage

East:104.2

South:37.7

West:96.1

North:43.3

Details
  • Format: DOC
  • File size: 18.0 MB
  • Browse count:10342
  • Temporal coverage:2018-11-27 To 2018-11-27
  • Access: Offline
  • Updated time:2021-04-19
下载数据
Authors

Resource Provider: JIANG Xiaohui  

导出元数据
Word