Operation and cascade operation scheme of reservoirs (4 power stations under Gansu Power Investment Management) in the upper reaches of Heihe River (operation and optimal operation scheme of the first, second, third daowan and Baoping hydropower stations in Longshou)
Word format storage
Jiang, X. (2015). < b>Operation and optimized dispatch of power station in the upstream of the Heihe River Basin</b>2015. doi: 10.3972/heihe.280.2014.db. (Download the reference: RIS | Bibtex )
Using this data, the data citation is required to be referenced and the related literatures are suggested to be cited.
To respect the intellectual property rights, protect the rights of data authors, expand services of the data center, and evaluate the application potential of data, data users should clearly indicate the source of the data and the author of the data in the research results generated by using the data (including published papers, articles, data products, and unpublished research reports, data products and other results). For re-posting (second or multiple releases) data, the author must also indicate the source of the original data.
None
1.Scenario analysis of social and economic development over Heihe River Basin (2020 & 2030)
2.Physical and chemical index data of deep drilling strata in the middle reaches of Heihe River (2013)
4.A survey construction of a water-saving society in Zhangye city, Gansu (2013)
5.Input output table of Heihe River Basin in Gansu Province in 2002 and 2007
7.Macro index data of social economy at city (county) scale in Heihe River Basin
No record
No record
Sign In to add comments
Spatial coverage |
East:104.2 South:37.7 |
West:96.1 North:43.3 |
---|
Resource Provider: JIANG Xiaohui