"Hydrologic - ecological - economic process coupling and evolution of heihe Basin governance under the framework of water rights" (91125018) project data exchange 4-basin-plan-mdb
1. Data overview: a watershed plan revision for the Murray darling river in Australia, adopted in 2012, for catchment comparisons
2. Data content: the public plan
The file is stored in document PDF format and can be opened by Adobe Acrobat and other reading PDF software.
Wang, Z. (2016). < b>Basin-Plan-MDB (2012)</b>2016. doi: 10.3972/heihe.423.2014.db. (Download the reference: RIS | Bibtex )
Using this data, the data citation is required to be referenced and the related literatures are suggested to be cited.
To respect the intellectual property rights, protect the rights of data authors, expand services of the data center, and evaluate the application potential of data, data users should clearly indicate the source of the data and the author of the data in the research results generated by using the data (including published papers, articles, data products, and unpublished research reports, data products and other results). For re-posting (second or multiple releases) data, the author must also indicate the source of the original data.
1.Scenario analysis of social and economic development over Heihe River Basin (2020 & 2030)
2.The leaf water potential dataset in the downstream of the Heihe River Basin (2012)
3.HiWATER: the albedo in the middle reaches of the Heihe River Basin (Jun. 29, 2012)
4.Datasets for the SWAT model in Heihe Rriver Basin
5.HiWATER: Dataset of infrared temperature in Zhanye Airport desert
8.HiWATER: Airborne CCD image data in Hulugou Catchment
10.HiWATER: Airborne CCD image data in the Shenshawo desert area of the Heihe River Basin
No record
No record
Sign In to add comments
Spatial coverage |
East:153.5 South:41.0 |
West:113.0 North:10.5 |
---|
Resource Provider: WANG Zhongjing